PM 1000 URM – the new standard in subgrade rehabilitation

  • Up to 100% recycling of the existing ballast material
  • Creation of a new supporting layer using existing material
  • Lower disposal costs
  • Up to 50% fewer logistical pauses than existing systems
  • Higher track availability thanks to shorter periods in possession
  • Rehabilitation capacity of up to 1400 metres per day
  • 3 excavation chains
  • Simultaneous installation of 2 geoplastics possible
  • Installation of supporting and protective layer in one operation
  • Rehabilitation capacity of up to 120 m/h and up to 1400 m/day
  • Ballast recycling with high-pressure washing
  • Short set-up times