Teisendorf – Traunstein Project from km 59.488 to km 54.052

Builder-owner: Deutsche Bahn AG, southern branch, Freilassing network region
Construction period:
19 April 2008 – 9 May 2008
Shift capacity PM 200-2R: 528 m
Daily capacity PM 200-2R: 943 m

Total conversion length: 5,382 m
Existing type of permanent way: K60-1667-HH

Supplementary information further to track permanent way:
Radius: minimum radius = 401 m
Superelevation: u = 140 mm

The complete data are available for downloading as a PDF.