Project: Bönen – Unna – Bönen

On behalf of Stadthagen-based Schweerbau, formation rehabilitation in both sectional tracks, including ballast recycling and high-pressure washing of the existing, old ballast, was achieved during a construction period spanning just 10 days.

The complete data are available for downloading as a PDF.