VLA/ULW

Loading unit (VLA)
Transfer wagon (ULW)

The VLA serves to round off the product range. It is used to dig up the edge paths in front of a formation rehabilitation machine. If necessary, the loading belt is extended from the MFS. The transfer wagon serves to load the excavated material at a distance of up to 8.50 m away from the track axis.

Performance1,5 cbm/min
Width hopper2.200 mm
Height hopper1.200 mm
VLA
ULW
Scroll to Top