AHM 800-R

on sections
with grade 2 mixture

The AHM 800-R is used on sections in which grade 2 mixture is installed. It is able to remove the ballast with the ballast excavating chain, crush it on the machine, mix it with new material and re-install it as a formation layer/frost layer. Installation of the new ballast is carried out in a separate operation.

Performance ø in 12 hours300 m
Max. performance per hour60 m
Ballast Excavation Chain - Capacity 300 cbm/h
Excavation width 4.000 - 4.600 mm
Subgrade Excavation Chain - Capacity500 cbm/h
Excavation width4.030 - 6.000 mm
Excavation depth max.1.390 mm
Installation height up to500 mm (PSS/FSS)
Installation height, track formation layer300 mm
Material supply (backwards)Container carriage 12 or 24 cbm
Evacuation (to the front)MFS 100