Project: Heidelberg - Wiesloch-Walldorf

Renewed route (4000) Mannheim main station – Basel – Konstanz (DB-Border)
Supplementary information to track renewal with GE, vBe, BR, PSS, TE,
Route 4001: Heidelberg-Kirchheim/Rohrbach – Wiesloch-Walldorf
Route 4002: Wiesloch-Walldorf – Heidelberg-Kirchheim/Rohrbach
railways in the stations Wiesloch-Walldorf, Heidelberg-Kirchheim and Heidelberg

Builder-owner:
DB Netz AG, branch southwest, I.NP-SW-M-O, 76137 Karlsruhe

Construction period: 31.08.2018 – 08.12.2018
Shift progress rate PM 200-2R: 660 m
Existing type of permanent way: W 60-1667-B70
New type of permanent way: W 60-1667-B70

Scroll to Top